Contact Information: 803-524-0051/ Dcorraggio@gmail.com
Dwayne Corraggio
Page 1 of 4
PROFESSIONAL SUMMARY
Dwayne Corraggio
Dcorraggio@gmail.com
C(803)5240051
SUMMARY
● CIVILS Clearing, Grading, Tower Foundations (mat/pier, spread footings, caissons), Concrete Pad Work,
Retaining Wall Systems, Electrical/Grounding System Installations, Fencing/Landscaping, Site
Maintenance, Boring, Trenching, Paving, Equipment, Shelter Transportation Setting, Utility and Telco
Construction, Erosion Control, Geo’s, T1 Upgrade, Power/Telco HFrames and Common Demarks,
Commercial & Residential Construction. Project Manage Steel building construction & Blue Print
experience. Extensive experience in Project Management of home building and commercial steel building
construction processes. Installation of sheetrock, tape and floating complete master experience. Concrete
slab finishing equipment, Power trowel, bull float, screed scoring, tile laying construction, wet saw, scoring
cutter, mud flooring. Experience with permitting with Township and P.E. as well as other entities.
● TOWER New Construction & Tower Erection to include ( Self Support, Monopoles/MonoPines, Flag
Poles, Light poles, Billboards, Church Steeples, Guyed Towers and Stealth Installations), Antenna and Line
Installation, Equipment Installation, Sweep Testing Modifications, Roof Top Work, Vaults, Structural
reinforcement and strengthening, Tower Mapping, Tower Decommission, Tower Lighting, Microwave
Hops, Path Alignments
● 15 years of Construction/Project Management within the wireless industry. 10 years of Residential and
commercial construction, Working with clients such as TMobile, Crown, Nextel, SBA, Sprint, Metro PCS,
Cingular, AT&T, VoiceStream, Verizon, AlcatelLucent,Ericsson,Nokia , Bechtel, Velocitel Engineering,
SunCom, WFI , Frost Brothers Home Builders, Corraggio Construction Inc. (CCI)
● Able to handle multiple projects at one time ranging from $35,000 to $2M and staying within budget and
time frames.
● Excellent managing, negotiating, and leadership skills with use of diplomacy.
● A team player at meeting customer needs, problem solving, mediation, and motivation.
● Ability to learn new areas of business at a rapid pace.
TECHNICAL EXPERIENCE
Software/Databases/Tools:
Operating Systems:
XP Office applications, Microsoft Office Suite 07, Excel, First and
second generation of Ultrasite Edge and NUSS software, Siterra,
FST,EAMS, EPM, CAM, CASPER,RNAM.
Windows 95/98/2000/2007/2010 MS Office Suite
Equipment/Hardware/Networking/Telecom:
Nokia BTS Hub Manager and Hardware configuration, GSM, 3G
UMTS,DAS Successfully QA Managed 5000 Cell sites in NY, Liberty
Project Nokia/AWS. Ericsson UMTS and Nokia Flexi 3G Projects. My
proven due diligence in checking closeouts and working closely with
the GC's to help them successfully complete the close outs helped the
project and proved to the carrier teamwork is successful. Experience
ensuring where lease areas are and ensuring that the GC's are abiding
by the SOW guidelines. By applying my years of experience and
knowledge to help the vendors and GC's successfully complete their
Contact Information: 803-524-0051/ Dcorraggio@gmail.com
Dwayne Corraggio
Page 2 of 4
SOW. Heavy and light equipment operator ,Ditchwich walk behind
trencher, DW3500 trencher, rock saw, Case Uniloader, loader, Bobcat
skidsteer loader, excavator, Caterpillar bulldozer D3, D5. Caterpillar
Back hoe, Concrete walk behind saw and hand held QC saw, skill saw,
miter saw, chainsaw, boring machine, drill press, rough terrain forklift,
warehouse forklifts, ramset, duo fast air nail guns, framing square, tape
measure, measuring wheel, laser tripod.
PROFESSIONAL EXPERIENCE
SBA Communications NC/SC
12/2013 5/2015
Construction Supervisor
Managed medium scale project full life cycle for construction. GC’s SOW QA for all SBA owned cell sites
in the TMobile AAV Construction project. Worked closely with Site Acquisition Management obtained
Electrical and Build permits as required by multiple Municipalities.
Ensured all Construction Drawings and SOW and inspected sites Pre and post construction of cell site
construction. Completed In depth QA checklist for punch items.
Ensured site Milestones and construction was completed by the forecasted completion schedule
ALCATELLUCENT, Sprint NV Raleigh, NC Myrtle Beach SC
6/2012 – 12/2013
Senior Construction Manager
Private Contractor for Sprint Network Vision. To AlcatelLucent . SNV project in North and South Carolina as
Construction Manager. Responsible for all aspects of 3G & 4G Construction Management of set number of sites.
Manage all dates forecast and actual in Field Scheduling Tool (FST) for said sites as well as the financials and PO's.
Manage the A&E firms doing the A&E walks and audits with each firm and redlining the CDs to make all necessary
corrections. Walked all sites with the Network Vision vendors as well as redlining NV plans to determine what is
needed to bring fiber, microwave, or copper to accomplish communication needs at each site.
TMOBILE, Charlotte , NC, SAPPHIRE TECHNOLOGIES , Charlotte, NC
6/2010 – 6/2012
Senior Project Manager/Consultant
Project Construction Manager .PM/CM over all field coordinators in the process of full site audits for TMobile
through Randstad Engineering/Sapphire Technologies, as well as producing field site sketches for the purpose of
determining proposed locations for Ericsson BTS Cabinets in combination with Purcell Power Cabinet.
Responsibilities include field management for civil construction and process for building BOQ’s, FPQ’s as per
TMobile and Ericsson specifications. PM over site construction, UMTS, site inspections, in charge of as many as
25 crews and construction managers, as well as managing other PMs along with 5 different trackers governing all
the construction, scheduling, and site inspections.
ERICSSON SOUTHEAST REGION , Fusion Solutions, Inc., Charlotte, NC
Project Manager/Consultant
Implemented large Scale Rollout for IUB 7.2 RNC Upgrade.
Implemented small scale Retrofit ISL Cables PCN 408 for RNC’s.
NSORO MASTECH, LLC, Charlotte, NC, Birmingham,Al
1/2008 – 1/2010
Project Manager
Project Construction Manager .PM/CM over all field CM’s in the process of full site audits for AT&T, and RFDS
redlines. Processing quotes for site/tower modifications and the decommissioning of old TDMA equipment.
1/2010 – 6/2010
Contact Information: 803-524-0051/ Dcorraggio@gmail.com
Dwayne Corraggio
Page 3 of 4
Responsibilities include field management for civil construction and process for building OOM’s, FAB’s as per
AT&T specs. Full spectrum training of rookie CM’s from precons, quotes to site construction and punch walks.
Review, correct and QA site audits done by others using pictures and information gathered at the sites. I performed
complete groundaudits as a one man team including pictures and site sketches as well as electronic input to local
company drive. Managed Radio T1 Harvest project ensured all BTS radios harvest properly.
PRIVATE CONTRACTOR TO TMOBILE
Feb 2007 – Jan 2008
Project Manager/Construction Project Manager
Project Construction Manager .PM/CM over all field coordinators in the process of full site audits for TMobile
through Nokia, as well as producing field site sketches for the purpose of determining proposed locations for Nokia
FlexiCabinet in combination with Purcell Power Cabinet. Responsibilities include field management for civil
construction and process for building BOQ’s, FPQ’s as per TMobile and Nokia specifications. PM over 2G/3G site
construction, UMTS, site inspections, in charge of as many as 25 crews
And 10 construction managers, as well as managing other PMs along with multiple trackers governing all the
construction, scheduling, and site inspections .
PRIVATE CONTRACTOR TO ERICSSON
Jun 2006 – Jan 2007
Construction Project Manager/ Construction Manager
Responsibilities include completion of daily scheduling. Monitor all construction work in the field. Coordinate
with Telco and power providers in order to schedule and provide utilities for each site. Monitor and address quality
issues in the field in regards to construction. Work with power provider, Telco provider, and contractors to resolve
said issues. Provide other market CM’s with daily task and scheduling. Coordinate day and night activities with all
market contractors including Cingular managed groups. Provide daily updates as to site readiness. Assist CM’s
with setup and scheduling of site scrubs in order to provide CCI, Emerson, and Parsons with proper information in
order for them to complete their part of the UMTS project. Coordinate punch walks with CM’s and contractors.
Help troubleshoot any issues with Cingular field techs in order to resolve trouble tickets as promptly as possible.
Help out with scrubs, Telco issues, and quality assurance within the Charlotte and Greensboro UMTS market.
Attend all meetings with Cingular and BellSouth to help speed up the process of NIU relo’s. When needed conduct
the daily bridge. Responsible for all activities and scheduling of the Tiger Team to correct and eliminate any issues
that would impair market launch.
PRIVATE CONTACTOR TO CINGULAR WIRLESS
Jan 2006 Jun 2006
Construction Project Manager
Managed medium scale TMA Installation Audits (400). Audited 75 DAS Sites for PreConstruction.
LEMCON NETWORKS LTD – (NOKIAMARKET MANAGER CAROLINA’S NEW BUILD PROJECT,
NOKIA CENTRAL REGION MARKET MANAGER) , Charlotte, NC
2005 2006
Market Manager
Managed all Project Managers for Multiple Projects Swap project New site builds, modifications, decommissioning.
Ensured with daily meetings that all Milestone reporting sync up all forecasts included in all daily reporting.
Project budget reporting to all directors and shareholders.
Morrison Herschfield/Sprint
Direct Consultant Construction Manager II
2004 2005
Managed and Inspected Civil/Construction SOW created BOM for Charlotte Sprint Project
Directly working with Site Acquisition to drive SOW details.
EXIPARSONS (CONTRACTOR TO NOKIA WORKING DIRECTLY WITH CINGULAR WIRELESS,
AWS, BECHTEL CORP.) , Summerset, NJ
Project Lead Manager /Field Manager/CPM
2002 2004
Contact Information: 803-524-0051/ Dcorraggio@gmail.com
Dwayne Corraggio
Page 4 of 4
Recruited to lead and supervise teams of field technicians in the Connecticut, Pennsylvania, Co, New Jersey,
New York, Maryland, Washington D.C., NW Fla., La., Al., Ms. and Massachusetts markets.
BUTLER INTERNATIONAL (CONTRACTOR TO NOKIA) , Summerset, NJ
2001 2002
QA BTS Installation Supervisor
Coordinate, manage and track the QA team's efforts to ensure progress against identified milestones of the next
generation product release, identifying and working to resolve issues, risks and schedule conflicts.
Review all Engineering project documents including requirements & functional specifications to ensure the
testability of the product.
MYCOM NORTH AMERICA, Bothell , WA
2000 2001
BTS Engineer III
Travel to prospective cellular sites for Technical Site Survey.
Survey cellular sites for the installation of the Nokia BTS Ultrasite equipment, Installed, commissioned and
integrated BTS.
Participated in Nokia BTS Engineering III Certification Dallas, Tx. Nokia Center of Excellence
Bartlett Nuclear Inc. Multiple Nuclear Power Stations in the USA
1997 2000
Health Physics Technician Consultant and Decontamination Technician Part Time
Fuel Floor support during fuel bundle relocation kept area from other personnel accessing without proper
clearances . Assisted all operations in ensuring site cleanliness. Managed equipment installation of NRC
approved two way communications. Loaded and installed BTS and antennas inside of containment building for
Vender radios. Cleaned area per scope of work ensuring personal protection is properly used.
Scott Jewelers Methuen, Ma .
Store Manager/Sales Manager
POS training direct sales management. Diamond Training DIA, Store manager responsibilities
Attended all corporate functions and meetings reporting number one in sales for the NE Region
Frost Brothers Builders Inc. Austin, Tx.
1990 1995
Construction Manager/ Field Manager/Project Manager/Superintendent
Supervised all activities for assigned project in commercial building of steel erected buildings to residential homes.
Taped and float, texture, to paint and tile for kitchen , bathroom, wet saw , use of many types of equipment from
bulldozers to excavators trenchers for putting in telco and cable to supervise electricians when plumbing in breaker
boxes and subpanels. Making sure all blueprints are current with contractors and ensured the scope of work is done
Corraggio Construction Inc.
1986 1990
CEO Owner.
Installed Woodstoves, Fireplaces, gas logs, Inserts. Installation of Ceramic tile in custom homes. Designed and
installed outdoor pavers for landscaping. Installed chimney pipe through attics and roof tops installed chimney caps.
I also did drywall finishing and acoustic texture on ceiling and walls. I have also done stomp and drag design for
ceiling texture. Installed from 3x3 wall tiles to 24X24 Italian Marble with cement thin set ensuring that flooring is
level using mud flooring if needed. Saltillo tile installation using linseed oils and polishes for a fine polished finish. I
have also build custom back splash for kitchen using a hand painted ceramic Italian tile art deco. I have experience
installing mosaics for shower enclosures and Jacuzzi tub enclosure.
1995 1997